Equipment For Hire

DATA CENTER HEAT LOAD TESTING EQUIPMENT FOR HIRE

So, why should you use server emulators and heat load units instead of servers to test the operation and reliability of a data center?

Using servers is impractical for the following reasons:

  • Extremely expensive to fill the data center with servers.
  • IT implementation plan (and load profile) may be such that the facility may not reach 100% load for many years.
  • Servers are designed to increase and decrease power consumption depending on the processing requirement of an application. Testing requires stable, predictable loads.
  • Potential for damage to IT equipment as a result of power downs, failed tests and failed cooling.
  • Time to reset servers after each test

Instead of using servers, you can hire heat load and server emulators.

 

[masterslider id=”11″]